Water and Wastewater Treatment Solutions 

Increased Energy and Water demand across the region require innovative strategies to balance supply.

Elsewedy Electric’s reference in the water sector dates almost two decades back, starting from ground up, by building automation and control systems for desalination plants in collaboration with industry leaders like Alstom PAC and GE IP.

Our core business today is to provide end-to-end turnkey water treatment and desalination projects, providing customized integrated solutions that serve our clients’ needs; from designing, procurement, construction, operation, maintenance and rehabilitation in collaboration with public & private sectors. 

It is worth mentioning that Elsewedy Electric has played a vital role among market’s leaders in “Fujairah Integrated Water and Power Projects”, UAE, the largest IWPP, to design and deliver the entire package of the control system meeting international standards.

  • Desalination projects
  • Sewage wastewater treatment plants 
  • Industrial wastewater treatment plants 
  • Pumping & lifting stations and networks 
  • Surface Water Treatment plants
  • Skid mounted solutions fit our customer’s needs and applications
  • Tourism, municipal, military & industrial sectors

Projects

Supplying 15 Thousand cubic meters of drinking water Nuwibaa “SWRO” Desalination Plant 15,000m3/Day

Date: 2019

Client: Ministry of Housing, Utilities & Urban Communities (MOH)

Joint Venture with GIS Aqua

A new flagship 15,000 m3/day water desalination plant on the Red Sea, South Sinai. The water will be pumped from the sea to three desalination streams. We will engineer, design, supply, construct, install, commission and test the plant as a turnkey project, as well as provide operations and maintenance for the first year and supervision for the second year. Sea Water Reverse Osmosis (SWRO) involves: 

 

  • Cartridge filter filtration
  • Dual media pressure filtration
  • Filters backwashing 
  • Chemical treatment systems 
  • Reverse osmosis unit with:
  • High pressure pump
  • Pressure vessels and membrane
  • Energy recovery system
  • Membrane cleaning unit (CIP) 

Providing Clean Water for Beni Suef 4800 MW Combined Cycle Power Plant, Beni Suef, Egypt

Date:   2015

Client:  EEHC

In Consortium with Siemens AG

In charge of the treatment of the river water used for the world’s largest combined-cycle power plant ever built on fast track basis, installing a lamella clarifier and reverse osmosis/ion, exchange demineralization and filtration system, in addition to handling the sewage and wastewater treatment.

Desalination and Purification for AL LAYYAH1026 MW Combined Cycle Power Plant, Sharjah, UAE

Date:   2018

Client: Sharjah Electricity & Water Authority

Consortium with MHPS

We have been awarded the Engineering, Procurement, and Construction of Layyah co-generation plant.

The plant is located on the Arabian Gulf shore, within the existing Layyah Power Plant, next to Khaled Seaport, in the State of Sharjah, UAE.

The power plant is configured as a 2x2x1 gas turbine based combined cycle, using two M701F model MHPS gas turbine units, two horizontal fired triple pressure level reheat type heat recovery steam generators “HRSG’s” and one tandem compound condensed type steam turbine.

Low pressure steam will be condensed in a once through condenser using the arabian gulf water as heat sink. 690 ton\hr of steam will be extracted from the steam cycle to feed the existing Layyah thermal desalination units, which is used to supply Sharjah state with their need of potable water.

As part of our joint EPC scope of works, we are responsible for all plant supporting and auxiliary systems such as; water demineralization units for plant internal use, the installation of the electro chlorination, oily wastewater treatment, chemical neutralizing, fin fan cooler, intake pump house, outfall piping, as well as the water treatment.

Request Service

MAKE A QUERY