Julius Nyerere Dam 2,115 MW Hydropower Project - Tanzania
Engineering, procurement, and construction (EPC) of the Rufiji Hydropower Project at Stiegler’s Gorge along the Rufiji River in the United Republic of Tanzania.
134m RCC-dam, a 34 billion m³ reservoir, 3 power tunnels, a powerhouse incl. 9 x 235 MW vertical Francis hydroturbines, and a 400 kV substation.
- 2,115 MW, 6,307 GW/H
- Our First Hydropower Project
- Engineering, procurement, and construction (“EPC”) of the Rufiji Hydropower Project at Stiegler’s Gorge along the Rufiji River in Tanzania.
- 134m RCC dam, 34 billion m³ reservoir, 3-power tunnels
- A powerhouse incl. 9 x 235 MW vertical Francis hydroturbines and a 400 kV substation.
- Total installed capacity is 2,115 MW, generating approx. 6,307 GWh/annum.
- Turnkey lump sum contract value of USD2.9 billion.
Follow our YouTube channel: