RABIGH 1,200 MW CCPP
The power block features three SGT6-5000F series gas turbines, three SGen6-1000A-series electrical generators, one SST-5000 series HI-L steam turbine, one ST Generator: SGen6-3000W, and a water-cooled condenser.
ELSEWEDY ELECTRIC PSP's scope of work includes the design, engineering, procurement, construction, permitting, testing, and commissioning of a new gas-fired CCGT power plant.