Location: Kasoa-Mallam
Year: 2024
Client: GRIDCo
Project Operation: Executed the reconstruction and upgrade of the 161kV Kasoa-Mallam transmission line. The project involved converting a 20km corridor into a double circuit overhead transmission line to reduce transmission losses and secure long-term grid stability